Program 1
Apartment Turns & Make-Ready
Apartment turns are the work required to prepare a vacated unit for a new resident on a tight, checklist-driven timeline — from surface repair through final cleaning.
What This Program Covers
- Interior apartment painting
- Drywall repair
- Final and tenant turnover cleaning
- Baseboards and trim
- Door repair and replacement
- Punch lists
- Caulking
- General unit preparation
- Inspection and correction of defects

How This Work Is Organized
How a Project Moves
- 1
Vacant Unit
A unit is vacated and ready for turn assessment.
- 2
Scope & Inspection
A walk-through identifies the painting, drywall, trim, and defect work needed before re-occupancy.
- 3
Coordinated Trade Work
Painting, drywall, carpentry, and minor repairs are carried out in sequence.
- 4
Punch List & Final Cleaning
Remaining items are corrected and the unit receives final turnover cleaning.
- 5
Ready for Next Resident
The unit is prepared for leasing or move-in.
Trade Capabilities Used
Apartment Turns & Make-Ready draws on the following trade capabilities to complete the work.
- Painting
Apartment interiors, Exteriors
- Drywall
Wall and ceiling repair, New drywall installation
- Turnover & Post-Construction Cleaning
Final apartment cleaning, Tenant turnover cleaning
- Carpentry & Finish Trim
Baseboards and casing/trim, Door replacement (prehung, slab, bifold)
Questions
Apartment Turns & Make-Ready Questions
What does a typical apartment turn include?
Interior painting, drywall repair, baseboards and trim, door repair, caulking, and final turnover cleaning — coordinated as one unit-level scope with a punch list and defect correction before the unit is marked ready.
Can painting, drywall, or cleaning be requested without a full unit turn?
Yes. Painting, drywall, and turnover cleaning are also available as standalone trade capabilities for work that doesn't require a full unit turn.
Does an apartment turn include appliance or major system replacement?
No — apartment turns focus on surface repair, painting, cleaning, and unit preparation. Major system work is not part of this program's scope.
Start a Conversation
Ready to talk about apartment turns & make-ready?
Reach out to start a conversation about scope and next steps.